Contractors in Sherwood, Oregon
Washington County • Population: 20,535
Showing 29 verified contractors
π§±Concrete in Sherwood
πͺWindows & Doors in Sherwood
π¦Gutter Cleaning in Sherwood
Quick answer
The City of Sherwood Building Department handles building, mechanical and plumbing permits through the State of Oregon ePermitting system, and Washington County permits and inspects electrical work. Removing a street tree 5 inches or larger needs a city permit.
Sherwood reviews and inspects its own building work but leaves electrical permits to Washington County. Street trees are the main tree rule you'll run into.
Who issues building permits
The City of Sherwood Building Department provides plan review and inspections for residential and commercial projects, including mechanical, plumbing, fire suppression and sign permits. Applications go through the State of Oregon's ePermitting program. You can reach the department at [email protected] or (503) 625-4226, at 22560 SW Pine St.
Electrical work is the exception. "Electrical work performed within the city is permitted and inspected by Washington County," the department's page says. Our electrical license guide explains what your electrician should carry.
Confirm any contractor in the CCB license search before you sign. For the statewide picture, see Oregon building permit requirements.
Tree removal and street trees
Trees on single-family lots don't need a permit unless they are street trees, per the city's trees FAQ. If a tree is not a street tree, you can remove up to five in a calendar year. Trees on commercial, industrial or apartment property were often required by land use approval, and those usually need a permit.
The city's tree removal page covers street trees:
- Every tree in a planter strip is a street tree. For a front-yard tree without a planter strip, ask Planning at [email protected] or (503) 925-2308.
- The adjacent property owner is responsible for street tree maintenance.
- A Street Tree Removal Permit is required for trees 5 inches DBH and up before work starts. Trees under 5 inches can come out without a permit if they are replaced within six months.
- For trees over 10 inches, the application needs a letter from a certified arborist on the tree's condition and alternatives to removal.
- All new and replacement street trees need a root barrier.
After you apply, the city gives you a sign to post for a 10-day public notice, per the FAQ. Hire an ISA certified arborist for inspections. The city recommends one rather than inspecting street trees itself.
If a street tree has lifted the sidewalk, the FAQ says to check whether the repair needs a right-of-way permit from the Engineering Department. Your contractor's quote should say who pulls it. Our concrete cost guide covers sidewalk and flatwork pricing.
Business license and the Metro license
Any business located in Sherwood, or representing itself as doing business there, needs a city business license unless Municipal Code Chapter 5.04 exempts it, per the city's business license page. The license is in addition to the contractor's CCB license. Sherwood accepts the Metro license for building and landscape contractors headquartered outside city limits, and asks them to enter the Metro license number on the city form. Oregon Metro lists Sherwood among its 20 honoring cities. See our licensing guide for the state requirements.
Local conditions
NOAA's 1991-2020 normals for Aurora State Airport, southeast of Sherwood, show 39.55 inches of precipitation a year and 38.7 days with a low at or below freezing. Plan siding and roofing work for the drier months. DOGAMI's regional earthquake impact study covers Washington County and estimates Cascadia earthquake damage by city.
Find contractors in Sherwood
Browse Sherwood plumbers, electricians, HVAC companies in Sherwood, roofers, remodeling contractors, landscapers in Sherwood, house painters and siding contractors. Or get quotes.
Sources
- City of Sherwood: Building Department
- City of Sherwood: Trees FAQ
- City of Sherwood: Tree Removal
- City of Sherwood: Business Licenses
- Oregon Metro: Regional Contractor's Business License
- NOAA NCEI 1991-2020 Normals: Aurora State Airport, OR (USW00094281)
- DOGAMI Open-File Report O-18-02
- Oregon CCB License Search
Frequently asked questions
Who issues building permits in Sherwood, Oregon?
The City of Sherwood Building Department provides plan review and inspections for residential and commercial work, including mechanical, plumbing, fire suppression and sign permits, through the State of Oregon ePermitting program. Electrical work in the city is permitted and inspected by Washington County.
Do I need a permit to remove a tree at my house in Sherwood?
Only if it is a street tree. The City of Sherwood Planning Department says trees on single-family lots don't need a permit unless they are street trees, and you can remove up to five non-street trees in a calendar year. All trees in a planter strip count as street trees.
Does Sherwood accept the Metro contractor license?
Yes, for building and landscape contractors headquartered outside Sherwood city limits. The City of Sherwood asks those contractors to enter their Metro license number on the city business license form.
Who fixes the sidewalk when a street tree lifts it in Sherwood?
Street trees are the adjacent property owner's responsibility in Sherwood. The City of Sherwood says to have an ISA certified arborist check the tree, get a street tree removal permit if needed, and check whether the sidewalk repair needs a right-of-way permit from the Engineering Department.